Every freezing project starts with the same question: continuous tunnel or batch cabinet? The catalogue answer is “tunnel for high volume, cabinet for low volume”. In practice, throughput is only the first of four questions, and it is rarely the one that decides.
1. What format is the product in?
Loose, unpacked product flows through a tunnel without handling. The belt carries it, the injection cools it, and it leaves free-flowing. Packed product in trays or cartons can also run through a tunnel, but the pack becomes part of the thermal path and the dwell time grows with pack thickness.
A cabinet takes trolleys or racks. It handles mixed formats, odd shapes and small lots without a belt to load and unload, and it does not care whether the product is loose or boxed.
2. How often does the product change?
A tunnel is tuned to one product at one loading depth. Changeover means re-setting belt speed, injection and, often, the physical loading pattern โ and the first twenty minutes after a change are unstable.
A cabinet changes recipe in one touch. If the plant runs four products a day, the cabinet’s flexibility usually outweighs the tunnel’s efficiency even at identical tonnage.
3. What is the hourly output, really?
Below roughly 500 kg/h most plants find a cabinet easier to justify: the machine is smaller, the loading is manual anyway, and the tunnel’s continuous flow has no advantage if the line upstream feeds it in batches.
Above that, the tunnel’s cold-vapour recovery and stable temperature band start to show on the gas bill. A tunnel running at steady load uses nitrogen more efficiently than a cabinet running intermittent cycles, because every cabinet door opening is a loss.
4. What does the building allow?
Tunnels are long โ 6 to 36 metres on our standard models โ and need straight-line space at both ends for loading and unloading. Cabinets need floor area but no length.
Where the line has to fit into an existing room, the footprint question can decide the whole project before the economics are considered. Two-tier or spiral tunnels solve some of this, at a higher price.
The honest summary
| Situation | Better fit |
|---|---|
| One product, high volume, loose or single-layer | Tunnel |
| Several products a day, packed, below 500 kg/h | Cabinet |
| Long product needing long dwell | Tunnel |
| Irregular shapes, small lots, mixed schedule | Cabinet |
| Tight building, long line not possible | Cabinet, or spiral tunnel |
If the answer is still unclear, send the product list, the shift pattern and the building constraints. The machine follows from those three.